SY2#接收井桩基完成情况 | ||||||||
桩位编号 | 设计桩长(m) | 桩底埋深(m) | 桩顶埋深(m) | 施工桩长(m) | 弱风化岩埋深(m) | 入弱风化岩深度(m) | 浇筑完成时间 | 备注 |
F-8 | 17.5 | 33.2 | 9 | 24.2 | 31.14 | 2.06 | 2018.1.26 | 上部弱风化夹有强风化岩块 |
D-8 | 17.5 | 31.08 | 9.5 | 21.58 | 29.36 | 1.72 | 2017.1.27 | |
F-6 | 15.5 | 28.1 | 8.7 | 19.4 | 26.26 | 1.84 | 2018.1.27 | |
B-8 | 24 | 30.65 | 8.48 | 22.17 | 28.26 | 2.39 | 2018.2.1 | 上部弱风化夹有强风化岩块 |
B-6 | 24 | 28.38 | 8.53 | 19.85 | 26.88 | 1.5 | 2018.1.30 | |
D-6 | 15.5 | 25.72 | 8.6 | 17.12 | 24.15 | 1.57 | 2018.1.30 | |
E-8 | 17.5 | 31.46 | 29.8 | 1.66 | 2018.2.5 | |||
A-6 | 22 | 29.42 | 27.5 | 1.92 | 2018.2.5 | |||
A-8 | 22 | 30.14 | 27.5 | 2.64 | 2018.2.5 | 上部弱风化夹有强风化岩块 |