编辑文章

SY2#接收井桩基完成情况.xlsx




SY2#接收井桩基完成情况




桩位编号设计桩长(m)桩底埋深(m)桩顶埋深(m)施工桩长(m)弱风化岩埋深(m)入弱风化岩深度(m)浇筑完成时间备注
F-817.533.2924.231.142.062018.1.26上部弱风化夹有强风化岩块
D-817.531.089.521.5829.361.722017.1.27
F-615.528.18.719.426.261.842018.1.27
B-82430.658.4822.1728.262.392018.2.1上部弱风化夹有强风化岩块
B-62428.388.5319.8526.881.52018.1.30
D-615.525.728.617.1224.151.572018.1.30
E-817.531.46

29.81.662018.2.5
A-62229.42

27.51.922018.2.5
A-82230.14

27.52.642018.2.5上部弱风化夹有强风化岩块